Tools & calculators
Practical tools built on confirmed data. Where a figure has not been announced, and the install size has not, the tool says so and works in ranges instead of pretending otherwise.
Preloading begins at local midnight on November 12, 2026, seven days before release. The planner below tells you whether you have room and when to start.
Available now
Preload & Storage Planner
Work out whether GTA 6 will fit on your console, how much you need to clear, and the latest hour you can start preloading and still be ready for launch.
Open the plannerStory Completion Planner
How long the campaign will take at your play rate, and the date you would finish, estimated from GTA V and Red Dead Redemption 2.
Open the plannerPlanned
These need data that does not exist yet. Rather than publishing empty calculators with invented numbers, they stay listed here until there is something real to compute. Each entry says exactly what it is waiting on.
Heist Payout Calculator After launch
Cuts, take and per-player payouts for the campaign's scored jobs.
Waiting on: Mission payout values, which do not exist until people have played the game.
Property & Business ROI After launch
Payback period and hourly return on every purchasable property.
Waiting on: Purchase prices and income rates. Rockstar has not confirmed a property system exists.
Vehicle Comparison After launch
Side-by-side handling, speed and price across the vehicle roster.
Waiting on: Performance statistics for a roster Rockstar has only named four vehicles from.
100% Completion Tracker After launch
A saveable checklist of every collectible, activity and mission.
Waiting on: The full completion requirements.
How these tools are built
Hardware capacities are published manufacturer figures. Install size, which Rockstar has not announced, is modelled as a range derived from comparable releases and labelled as an estimate everywhere it appears. Nothing here is a prediction dressed up as a specification. See our editorial policy.